Fluid Applied Air and Moisture Barriers for New Construction

Air barrier is one of the few scopes on a commercial project that is required by code, critical to building performance, and routinely left unassigned until it becomes urgent. It belongs to no other trade. The framer does not do it, the mason does not do it, and the roofer does not do it. Chroma Coatings does.

We install fluid applied air and moisture barrier systems for general contractors and developers on new commercial construction and building additions throughout North Carolina and the East Coast.

Air Barrier & Fluid Applied

Applied Before Cladding

What a Fluid Applied Air Barrier Does

A fluid applied air barrier is a continuous membrane rolled or sprayed onto the sheathing before brick, panel, or cladding goes on. Once it cures it forms a seamless layer that controls air leakage and manages moisture in the wall assembly.

Continuity is the entire point. Air and water find the gap, so the value of the system lives in the transitions: around windows, at the roof to wall junction, at penetrations, and at every seam and fastener. That is application work, and it is the difference between a barrier that performs and a barrier that passes a glance.

Why It Matters to the Owner

Why General Contractors Should Assign It Early

Air barrier sits in a scheduling window that closes fast. It has to go on after sheathing and detailing are complete and before cladding starts, and if it is not bought out ahead of time it becomes a scramble that holds up the masons.

We recommend general contractors identify the air barrier scope during preconstruction. On projects where we are already performing New Construction painting, adding the barrier scope to our contract removes a subcontractor from your log and puts the schedule risk on a trade already mobilized to your site.

Our Application Process

01

Substrate Inspection and Moisture

We verify the sheathing is sound, dry, fastened correctly, and ready to receive the system. Manufacturer requirements for substrate condition are not optional and we document conditions before starting.

02

Detailing and Transitions

Seams, fasteners, penetrations, and rough openings are treated with the manufacturer’s specified detail materials. This is the step that determines whether the assembly performs.

03

Field Application

The membrane is applied at the specified thickness across the field of the wall, sprayed or rolled depending on the product and site conditions.

04

Inspection and Documentation

We verify coverage and thickness, document the installation with photos, and coordinate any third party inspection or testing the project requires before cladding covers the work.

Project Types We Serve

Add Air Barrier to Your Next Project

Send us the wall sections and the specified system. We will price it, schedule it, and install it inside the window you have.